29/06/23

 THURSDAY 29TH JUNE

This is what the floor looks like after being insulated with 2cm-thick Kaiflex in between the samba batons. As you can see the walls are almost fully insulated as well. The very lowest section has been insulated with 2cm-thick Kaiflex and the sections above it have been insulated with 3cm-thick Kaiflex.




Comments

Popular posts from this blog

29/06/23